Type: | Ultrafine Vertical Grinding Mill |
---|---|
Motor Type: | AC Motor |
Motor Power: | 200-1250kw |
Suppliers with verified business licenses
What is a vertical roller mill?
Vertical roller mill, also known as a vertical mill, is an advanced grinding equipment; it is an efficient equipment that integrates fine crushing, drying, grinding, and conveying.
Vertical roller mills are mainly used for grinding materials such as cement raw materials, cement clinker, steel slag, and coal slag.
What materials can be ground by a vertical roller mill?
Vertical roller mills are used to grind limestone, clay, raw materials, slag, nickel slag, manganese slag, cement, blast furnace slag, GGBS powder, fly ash coal, etc.
It can also be used to process various metal ores, such as iron ore, copper ore, etc., to provide qualified raw materials for the smelting process.
High grinding efficiency:Saving 40% -50% power consumption compared to ball mill. the grinding roller grinding table does not direct contact during the grinding process, so the noise of the whole system is low.
Low investment cost: It integrates crushing, drying, grinding, powder selection, and conveying into one, with a simple process flow and compact layout Small footprint, can be arranged in the open air, low construction cost.
Stable product quality: The product has a narrow particle size distribution, uniform particle shape, and good fluidity. Grinding roller bearings are lubricated with forced thin oil, which longer bearing life.
The high degree of automation: Adopt a fully automatic control system, that can realize remote control, easy to operate.
Process flow of vertical roller mill
1. Crushing and conveying: The block material is first crushed to a certain size by a jaw crusher (powdered or fine-grained materials can skip this step). Then, the bucket elevator conveys the material vertically to the storage hopper.
2. Grinding and crushing: The material is crushed by the grinding roller in the annular groove on the grinding disc. The crushed material continues to move to the edge of the grinding disc until it is carried away by the airflow at the wind ring. Large particles fall onto the grinding disc and continue to be crushed.
3. Collecting products: The fine powder is collected by the system's dust collector (such as a cyclone dust collector or a bag dust collector), which is the product ground by the vertical mill. For materials with high moisture content, hot air is introduced into the mill, and the wet materials are fully exposed to the hot air flow during the grinding, powder selection, and flow process and are dried to meet the product moisture requirements.
4. External circulation system: For granular materials that are not carried away by the airflow, they overflow the grinding disc return to the mill feed port through the external circulation bucket elevator, and enter the mill for re-grinding together with the newly fed raw materials.
Working Principle for vertical roller mill:
Model | Yield (t/h) | Grinding Plate Diameter (mm) | Grinding Path Diameter (mm) | Material Moisture (%) | Raw Material Fineness (%) | Raw Material Moisture (%) | Main Motor Power (kW) |
DBGM1300 | 20-25 | 1870 | 1300 | <10% | R0.08≤12% | ≤1% | 200 |
DBGM1500 | 26-34 | 2180 | 1500 | <10% | R0.08≤12% | ≤1% | 280 |
DBGM1700 | 40-50 | 2400 | 1700 | <10% | R0.08<12% | ≤1% | 400 |
DBGM1900 | 60-70 | 2680 | 1900 | <10% | R0.08<12% | ≤1% | 500 |
DBGM2200 | 85-110 | 2900 | 2200 | <10% | R0.08<14% | ≤1% | 800 |
DBGM2400 | 95-130 | 3140 | 2400 | <10% | R0.08<14% | ≤1% | 900 |
DBGM2800 | 120-160 | 3300 | 2800 | <10% | R0.08<14% | ≤1% | 1250 |
DBGM3400 | 190-240 | 4560 | 3400 | <10% | R0.08<15% | ≤1% | 1800 |
1. Are you manufacture or trading company?
We are factory, established in 2010.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4.How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.
6: How to get the free solution and quotation?
Please send inquiry to us ,leave your whatsapp and email,our sales manager will contact you within 1 hours.
*Send the engineers to guide the installation.
*Install and adjust the equipment for customers.
*Train the operator for customers.
*We also provide the technical service for our customers after the installation.
advanced Manufacturer of Crushing &Grinding Machines Shanghai dingbo has always been committed to manufacturing mining crushing equipment, sand-making equipment and industrial grinding equipment.